Home Contact Us Search Site Map
power plants and imports
Mpas and Drawings
Energy Production
Presentations
Energy Center Library
Renewable Energy















 


Afghanistan Energy Infrastructure Map Book

Existing Power Plants (in highFile size: 2,74 MB (2,875,392 bytes) or low resolutionFile size: 272 KB (278,528 bytes))

Future Power Plants to Year 2015 (1394) (in highFile size: 2,74 MB (2,879,488 bytes) or low resolutionFile size: 240 KB (245,760 bytes))

Existing Substations (in highFile size: 2,76 MB (2,895,872 bytes) or low resolutionFile size: 272 KB (278,528 bytes))

Future Substations to Year 2015 (1394) (in highFile size: 2,69 MB (2,826,240 bytes) or low resolutionFile size: 276 KB (282,624 bytes))

Existing Transmission Lines (in highFile size: 2,68 MB (2,813,952 bytes) or low resolutionFile size: 264 KB (270,336 bytes))

Future Transmission Lines (in highFile size: 2,69 MB (2,826,240 bytes) or low resolutionFile size: 276 KB (282,624 bytes))

Proposed CASA 1000 (in highFile size: 2,76 MB (2,899,968 bytes) or low resolutionFile size: 224 KB (229,376 bytes))

Updated NEPS - October 25, 2011 (in highFile size: 4,99 MB (5,238,784 bytes) or low resolutionFile size: 348 KB (356,352 bytes))

The files are available in high or low resolution. The low-resolution files are suitable for printing up to A4 size (e.g., for pasting into presentations and reports). The high-resolution files are suitable for printing posters from A3 to A0 size.

 

AEAI USAID Afghanistan